Richard Nevin
Unit Manager
|
 |
Strategically located close to Nuneaton in Warwickshire, Griff Quarry is ideally located to serve both the local market and contracts further afield, having easy access to the M1, M6 and M69 motorway networks.
There have been quarrying activities at Griff for many years, previously with Hanson Plc and Pioneer before that. The quarry produces high quality, high PSV Chipping’s, and a full range of other Chipping’s and fill materials. The on site Asphalt plant produces a full range of coated materials and is well placed to serve the local collect market.
The site currently produces around 200,000 tonnes of dry stone and 60,000 tonnes of coated materials per annum.
The site was awarded BS EN ISO 9001 2000 accreditation for Quality Management Systems in May 2005, and more recently has been recommended for registration for BS EN ISO 14001 for Environmental Management Systems.