skip to main content

A444 Burton-on-Trent

15 January 2013

Client: Staffordshire Highways

Product: AC 32 Dense Base 100/150 LEA

& AC 20 Dense Binder 100/150 LEA

Tonnage: 1,673t

Carbon Saved: 17 tonnes

A444

Overview: A very busy, heavily trafficked main road leading to the town was surfaced.

<< back

MQP Maxi Range
MQP Maxi Range

MQPs Maxi Range is a suite of asphalt products designed as flexible solutions for today's demands.

more